Gas transportation and marketing
The Company’s key strategic focus in gas transportation and marketing development is on growing gas exports to China, producing high value-added gas products for domestic and export sales, ensuring efficient gas consumption in the domestic market, and enhancing transit capabilities.
KMG prioritises meeting the consumer needs reliably and efficiently while diversifying gas sales markets. The throughput capacity of the gas transportation infrastructure has been aligned with the potential growth in domestic gas production. With timely investments into the gas transportation system, KMG has been able to supply the country’s regions with natural gas and grow the potential of export supply routes. JSC KazTransGas, KMG’s wholly-owned subsidiary, is the operator of our gas transportation system.
Gas pipeline infrastructure
JSC KazTransGas (KTG) is Kazakhstan’s national gas and gas supply operator. KTG operates the centralised infrastructure for commercial gas transportation via trunk pipelines and gas distribution networks, supports international transit and marketing of gas on the domestic and foreign markets, as well as designs, finances, builds and operates gas pipelines and gas storage facilities.
KTG operates the largest trunk gas pipeline network in Kazakhstan with a total length of 20,000 km, including 1,900 km of pipeline branches, as well as gas distribution networks with a total length of over 56,000 km. Gas transportation is supported by 42 compressor stations and 238 compressor units.
Intergas Central Asia (ICA) is the national gas pipeline operator and a wholly-owned subsidiary of KTG.
Today, ICA carries out export, internal transportation and transit of natural gas within the territory of Kazakhstan through gas pipelines with a total length of 12,481 km and a 164 bln m3 per year capacity.
ICA operates three underground gas storages (UGS):
- Bozoyskoye UGS in the Aktobe Region
- Poltoratskoe UGS in the South Kazakhstan Region
- Akyrtobinskoye UGS in the Zhambyl Region
Asia Gas Pipeline LLP is a 50/50 joint venture between JSC KazTransGas and Trans-Asia Gas Pipeline Company Ltd. (shareholder – CNODC, a subsidiary of CNPC), launched to finance, build and operate the Kazakhstan–China gas pipeline. The purpose of the project is to facilitate the transit of Turkmen and Uzbek gas to China, exports of Kazakh gas to China, as well as uninterrupted gas supply to southern regions of Kazakhstan. The pipeline comprises three strings: A and B, with a total length of 2,612 km and throughput capacity of 30 bln m3 per year, and the 1,304 km String C with a throughput capacity of 25 bln m3 per year.
Beineu-Shymkent Gas Pipeline LLP is a 50/50 joint venture between JSC KazTransGas and Trans-Asia Gas Pipeline Company Ltd. (shareholder – CNODC, a subsidiary of CNPC). The project is of paramount strategic importance to the Republic of Kazakhstan, as it supplies the natural gas needs of Kazakhstan’s southern regions, enables diversification of Kazakhstan’s gas exports, ensures energy security of the country, and builds a unified gas transportation system.
Management company | JSC Intergas Central Asia (ICA) | Asia Gas Pipeline LLP | Beineu–Shymkent Gas Pipeline LLP | JSC KazTransGas Aimak (KTGA) |
---|---|---|---|---|
Interest | KTG: 100% | KTG: 50% | KTG: 50% | KTG: 100% |
Key destinations | Exports, domestic market and transit | Exports and transit to China, domestic market | Exports to China, domestic market | Trunk pipeline gas transportation to the domestic market, transportation via gas distribution systems |
Key routes | Kazakhstan, Russia, Uzbekistan and Turkmenistan | Kazakhstan–China | Beineu–Bozoi–Shymkent | n/a |
Total length, km | 12,481 | 3,916 | 1,450 | 56,058 – gas distribution systems 975 – trunk pipelines |
Capacity, bln m3 per year | 164 | 55 | 15 | 3 – trunk pipelines |
The Beineu–Bozoi–Shymkent trunk gas pipeline is the second section of the Kazakhstan–China gas pipeline. The gas pipeline connects the western oil and natural gas fields with the southern regions of the country, as well as with the Bukhara gas-bearing region – Tashkent–Bishkek–Almaty gas pipeline, the Gazli–Shymkent gas pipeline and String C of the Central Asia–China gas pipeline. The actual length of the Beineu–Shymkent gas pipeline is 1,450 km, and its capacity is 15 bln m3 per year.
Further project development will be driven its capacity expansion to 15 bln m3 per year. To achieve this ambition, the company commissioned four compressor stations – Aral, Korkyt-Ata, Turkestan and 1A, and is advancing expansion projects for its existing compressor station No. 1 Bozoi and gas metering stations Akbulak and Beineu.
JSC KazTransGas Aimak (KTGA) is the largest gas distributor in Kazakhstan, operating 57,000 km of distribution and trunk gas pipelines across all ten regions and three cities of national significance connected to the gas grid.
KazTransGas Aimak’s key objectives:
- Ensuring commercial gas supplies
- Transportation of gas via distribution networks
- Management of gas transportation assets in the regions
Company | Trunk gas pipeline/gas pipeline | Length, km | Capacity, |
---|---|---|---|
Intergas Central Asia | Soyuz, Orenburg–Novopskov | 1,147 | 68.4 |
Central Asia–Center | 5,306 | 50.8 | |
Bukhara–Ural | 2,382 | 31.5 | |
| 2,462 | 10.2 | |
Akshabulak–Kyzylorda | 123 | 0.4 | |
| 1,061 | | |
Asia Gas Pipeline | Kazakhstan–China | 3,916 | 55 |
Beineu–Shymkent Gas Pipeline | Beineu–Bozoi–Shymkent | 1,450 | 15 |
Trunk pipeline gas transportation
Company | 2018 | 2019 | 2020 |
---|---|---|---|
Intergas Central Asia (100%) | 80,134 | 72,961 | 57,753 |
export | 18,873 | 19,069 | 12,687 |
transit | 47,693 | 40,229 | 30,788 |
domestic market | 13,568 | 13,663 | 14,278 |
Asia Gas Pipeline (100%) | 49,270 | 45,870 | 39,776 |
export | 5,484 | 7,090 | 7,011 |
transit | 42,960 | 38,280 | 31,878 |
domestic market | 826 | 500 | 886 |
Beineu–Shymkent Gas Pipeline (100%) | 8,352 | 10,087 | 12,694 |
export | 5,255 | 7,091 | 7,011 |
domestic market | 3,097 | 2,996 | 5,682 |
KazTransGas Aimak (100%), domestic market | 2,622 | 2,554 | 2,603 |
Company | 2018 | 2019 | 2020 |
---|---|---|---|
Intergas Central Asia (100%) | 19,543 | 22,325 | 16,302 |
Asia Gas Pipeline (100%) | 62,167 | 57,470 | 49,337 |
Beineu–Shymkent Gas Pipeline (100%) | 12,146 | 14,669 | 17,831 |
Company | 2018 | 2019 | 2020 |
---|---|---|---|
Intergas Central Asia (100%) | 19,543 | 22,325 | 16,302 |
Asia Gas Pipeline (50%) | 31,084 | 28,735 | 24,669 |
Beineu–Shymkent Gas Pipeline (50%) | 6,073 | 7,334 | 8,915 |
Total trunk pipeline gas transportation | 2018 | 2019 | 2020 |
---|---|---|---|
Intergas Central Asia (100%) | 80,134 | 72,961 | 57,753 |
Asia Gas Pipeline (50%) | 24,635 | 22,935 | 19,888 |
Beineu–Shymkent Gas Pipeline (50%) | 4,176 | 5,044 | 6,347 |
KazTransGas Aimak (100%) | 2,622 | 2,554 | 2,603 |
TOTAL | 111,567 | 103,494 | 86,590 |
In 2020, volumes of KMG’s trunk pipeline gas transportation were down by 16,904 mln m3 to 86,590 mln m3, mainly due to declines in Central Asian gas transit volumes to China, lower Russian transit gas flows transported by Gazprom via Kazakhstan, falling exports of the Karachaganak gas to Russia and lower gas exports from Tengiz due to declines in its production.
Gas distribution and regional expansion of gas infrastructure
Gas distribution and expansion of gas infrastructure in Kazakhstan’s regions
Construction of the Saryarka trunk gas pipeline
Between June and December 2020, as part of preparations for Phase 2 and Phase 3 construction of the Saryarka trunk gas pipeline (the 482.8 km Nur-Sultan–Kokshetau–Petropavlovsk section), the project feasibility study was adjusted, increasing the pipeline’s maximum throughput capacity from 3.6 bln m3
Phase 1 facilities (the 1,060.6 km Kyzylorda–Zhezkazgan–Karaganda–Temirtau–Nur-Sultan section), including automated gas distribution stations Zhezkazgan, Karaganda, Temirtau, Astana-1 and Astana-2, were commissioned in December 2019. The pipeline is owned by JSC AstanaGaz KMG, which has JSC Samruk-Kazyna and JSC Baiterek Venture Fund as its shareholders (50%/50%). In February 2020, the Saryarka gas pipeline was leased out to JSC Intergas Central Asia, the national gas pipeline operator.
Construction of the gas distribution infrastructure for the 1st and 2nd start-up complexes of Phase 2 in Nur-Sultan (residential areas Internatsionalny, Michurino and Kuygenzhar)
Pre-construction design and survey activities are in progress for the 1st and 2nd start-up complexes of Phase 2 under the integrated design and construction services contract. The 1st start-up complex will supply gas from AGDS-2 to the main gas distribution stations Vostok and Yugo-Vostok; the 2nd start-up complex will distribute gas from the Vostok station to residential areas Internatsionalny, Michurino and Kuygenzhar as well as to boiler houses. All works, including construction and installation, are scheduled for completion by 31 August 2021.
Construction of a gas supply pipeline link to five communities (Masanchi, Karakemer, Sortobe, Bular Batyr and Aukhatty) in the Korday District of the Zhambyl Region
In 2020, the construction of the 42 km high-medium pressure gas supply pipeline connecting five communities (Masanchi, Karakemer, Sortobe, Bular Batyr and Aukhatty) to the grid was completed in the Korday District of the Zhambyl Region.
As a result of the project, natural gas is now supplied to 10 locations, with over 62,000 people, 7,177 houses, 29 social infrastructure facilities and 243 SMEs. Plans for the future include expanding gas infrastructure to seven locations more.
Gas marketing
As the national gas and gas supply operator, KazTransGas exercises the government’s preemptive right to purchase raw and/or commercial gas from subsoil users/suppliers.
In accordance with the law, subsoil users send commercial proposals to the national operator, indicating the volumes, price and delivery point for the proposed supply of raw and/or commercial gas. The national operator uses its own judgement to decide whether to exercise or waive the government’s preemptive right.
Indicator | 2018 | 2019 | 2020 |
---|---|---|---|
Gas purchase volumes | 23,297 | 24,200 | 23,313 |
Kazakh subsoil users/suppliers | 17,209 | 16,435 | 19,879 |
Companies with KMG participation | 10,195 | 9,537 | 14,113 |
Third parties | 7,014 | 6,898 | 5,766 |
Gas imports | 6,088 | 7,765 | 3,434 |
Russia | 3,216 | 5,054 | 3,434 |
Uzbekistan | 2,872 | 2,710 | 0 |
Currently, the national operator exercises the government’s preemptive right to acquire gas from the following companies with KMG interest:
- JSC Embamunaigas (100%)
- JV Kazgermunai LLP (50%)
- Kazakhoil Aktobe LLP (50%)
- Kazakhturkmunay LLP (100%)
- KazMunayTeniz LLP (100%).
The gas supplied by the above companies is marketed in the domestic market.
Companies with a KMG interest that are exempt from the government’s preemptive right to acquire gas:
- Amangeldy Gas LLP (100%)
- KazGPZ LLP (100%)
- Tengizchevroil LLP (20%)
- Karachaganak Petroleum Operating B.V. (10%)
- North Caspian Operating Company N.V. (8.44%)
The above companies all sell gas domestically and for export.
Commercial gas sales volumes in 2020 were down by 0.5% to 22.7 bln m3, mainly due to reduced commercial gas exports to Russia and Uzbekistan. Gas exports totalled 7.9 bln m3, of which about 89% were sent to China.
Indicator | 2018 | 2019 | 2020 |
Export | 8,917 | 8,806 | 7,852 |
Russia | 2,350 | 1,000 | 560 |
Kyrgyzstan | 275 | 264 | 281 |
Uzbekistan | 807 | 452 | 0 |
China | 5,484 | 7,091 | 7,011 |
Domestic market | 13,999 | 14,028 | 14,811 |
Total | 22,915 | 22,834 | 22,663 |